GASKET,SHEET,3IN,600#,PTFE
Material 4100014465 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100014465
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (9 of 14 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 26 d · P80 28 d
- Unit price
- Rp 30,487
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~26 days; expected demand during lead time 0.9.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 23.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 23 now.
- 6.Installed on 14 FuncLoc(s), 9 of them criticality A/B.
- 7.ML early warning: 46% probability of demand in the next 90 days.
Proposed purchase requisition
23 EA
Rp 701,201 · order by 01 Oct 2026
Expected arrival ≈ 26 days
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 18Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
23
order qty 13
Service level
100.0%
stockout risk now 24%
Unit price
Rp 30,487
PO history
ML early warning: 46% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 193 days ago, 13 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 14 functional locations
9 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 3 | 28 | 11.58 |
| PX_PP-120B FUEL OIL PUMP | A | 1 | 3 | 1.05 |
| PX_CL-816 WASH WATER STRIPPER | A | 1 | 1 | 0.38 |
| PX_CL-573 SLOP OIL STRIPPER | A | 1 | 0 | 0.38 |
| PX_CL-634 C3 RECYCLE STRIPPER | A | 1 | 0 | 0.38 |
| PX_KC-155D CAUSTIC BLOWER | A | 1 | 0 | 0.57 |
| PX_PRV-708C SAFETY VALVE HE-179D | A | 1 | 0 | 0.04 |
| PX_SDV-1971B METHANOL ISOLATION | A | 1 | 0 | 0.06 |
| PX_HE-1919A QUENCH WATER CONDENSER | B | 1 | 0 | 0.22 |
| PX_2-IA-29658-A11A-HS PIPE-2 FROM VD-622 TO HE-410D | C | 1 | 0 | 0.01 |
| PX_6-P-9444-A51A-H PIPE-6 FROM HE-536 TO HE-538B | C | 1 | 0 | 0.01 |
| PX_FCV-1080A BY PASS LINE | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 26 ± 13 days (PO history, 4 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR06 Regular replenishment | 5 | Rp 31,623 | 25 Sept 2026 | 13 d |
| 16 Jun 2026 | PR03 Regular replenishment | 12 | Rp 30,199 | 08 Jul 2026 | 22 d |
| 15 Feb 2026 | PR06 Regular replenishment | 12 | Rp 30,238 | 24 Mar 2026 | 37 d |
| 18 Jun 2025 | PR06 Regular replenishment | 4 | Rp 30,736 | 07 Jul 2025 | 19 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 24 Sept 2026 | Low | PX_PP-120B | PP-120B high vibration |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 29 Aug 2026 | High | PX_BF-104 | Leak from packing |
| 08 Aug 2026 | Low | PX_BF-104 | [MSI-B-26-MZB-191] Permanent repair |
| 04 Aug 2026 | Medium | PX_BF-104 | Thermograph wall BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Mar 2026 | 5 | 201000009275 | Corrective |
| 30 Jan 2026 | 5 | 201000036633 | Corrective |
| 20 Jan 2026 | 10 | 203000029956 | Turnaround |
| 28 Nov 2025 | 8 | 203000032713 | Turnaround |
| 21 Jul 2025 | 1 | 201000023257 | Corrective |
| 31 May 2025 | 2 | 201000002909 | Corrective |