GASKET,SW,1/2IN,600#,PTFE

Material 4100014485 · GASKET · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100014485
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (14 of 19 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
SINAR TEKNIK INTERNASIONAL PT
Lead time
32 d · P80 50 d
Unit price
Rp 45,894

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 19 EA/year: 19 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~32 days; expected demand during lead time 1.6.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 34.
  • 5.Installed on 19 FuncLoc(s), 14 of them criticality A/B.
  • 6.ML early warning: 71% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 6Single sourceAbnormal consumption
On hand / on order
34 / 0
no open PO
Today Min / Max
11 / 23
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 14
Rec. Max
34
order qty 19
Service level
100.0%
stockout risk now 0%
Unit price
Rp 45,894
PO history
ML early warning: 71% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 122 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Lumpy · 7 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 19 functional locations

14 with criticality A/B · 24 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A2217.90
PX_HE-1500B
SEAL OIL CONDENSER
A173.22
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_CL-159
C4 PRODUCT TOWER
A100.38
PX_CL-473
QUENCH OIL SCRUBBER
A100.38
PX_KC-426D
RICH AMINE BLOWER
A100.57
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PP-138
COOLING WATER PUMP
A200.19
PX_PP-1865A
METHANOL PUMP
A100.19
PX_HE-1423B
WASH WATER TLE
B1113.65
PX_FCV-1950A
BY PASS LINE
B100.11
PX_HE-1454B
CONDENSATE REBOILER
B100.22

Lead time and procurement

Lead time 32 ± 18 days (PO history, 8 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR03
Regular replenishment
6Rp 46,69312 Sept 202612 d
08 Jul 2026PR03
Regular replenishment
13Rp 44,54228 Aug 202651 d
22 Jun 2026PR03
Regular replenishment
8Rp 46,77812 Jul 202620 d
28 Jan 2026PR03
Regular replenishment
8Rp 45,16918 Feb 202621 d
04 Nov 2025PR03
Regular replenishment
15Rp 47,68611 Dec 202537 d
24 Jul 2025PR03
Regular replenishment
7Rp 45,28003 Aug 202510 d
30 Jun 2025PR03
Regular replenishment
5Rp 46,50717 Aug 202548 d
12 May 2025PR03
Regular replenishment
9Rp 44,84906 Jul 202555 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair
28 Aug 2026EmergencyPX_PP-1729AInstall scaffolding at PP-1729A
26 Aug 2026HighPX_HE-1500BCleaning HE-1500B
11 Aug 2026MediumPX_PP-1729APP-1729A seal leak
12 Jul 2026MediumPX_HE-1500BRetubing HE-1500B
19 Jun 2026MediumPX_PP-1729AReplace bearing PP-1729A
17 Jun 2026MediumPX_PP-1729A[MSI-B-26-JZF-388/M] Replace line
08 Jun 2026MediumPX_HE-1423B[MSI-B-26-WAN-252/M] Replace line
09 May 2026MediumPX_BF-104-DUCT35Replace burner tip BF-104-DUCT35

Recent goods issues

Posting dateQtyOrderOrder type
01 Jun 20262201000034661Corrective
01 Jan 20261201000030385Corrective
30 Dec 20252201000013760Corrective
21 Dec 20256201000008694Corrective
19 Dec 20253201000005770Corrective
19 Dec 20256201000023844Corrective
01 Nov 20256203000039255Turnaround
24 Aug 20256209000006902Other maintenance
08 Aug 20251201000013229Corrective
Sparely