GASKET,SHEET,12IN,150#,PTFE

Material 4100014505 · GASKET · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100014505
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (12 of 16 FuncLocs A/B)
Supplier
GUNUNG INDUSTRI PRATAMA PT
Lead time
81 d · P80 176 d
Unit price
Rp 52,713

Recommendation

  • 1.Forecast 43 EA/year: 43 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~81 days; expected demand during lead time 9.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 35, order up to 79.
  • 4.On hand 14 + on order 12 is at or below the reorder point: order 53 now.
  • 5.Long lead time: 80% of deliveries took up to 176 days and the fastest seen in its category 15 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 12 of them criticality A/B.
  • 7.ML early warning: 45% probability of demand in the next 90 days.
Proposed purchase requisition
53 EA
Rp 2.8M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
14 / 12
next delivery 06 Oct 2026
Today Min / Max
7 / 14
static parameters in BoM
Rec. Min (reorder point)
35
safety stock 26
Rec. Max
79
order qty 44
Service level
100.0%
stockout risk now 1%
Unit price
Rp 52,713
PO history
ML early warning: 45% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 69 days ago, 39 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 16 functional locations

12 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_BF-104-BRN08
COIL OUTLET BF-104
A121.30
PX_KC-137A
C4 PRODUCT COMPRESSOR
A121.43
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_3/4-MS-11706-A51A-H
PIPE-3/4 FROM PP-1348 TO HE-1982
A100.01
PX_KC-476C
ETHYLENE FAN
A100.57
PX_LCV-982
HE-1877D LEVEL CONTROL
A300.12
PX_CL-1871
CHARGE GAS SCRUBBER
B162.09
PX_CL-1699
DEMIN WATER COLUMN
B321.23

Lead time and procurement

Lead time 81 ± 83 days (PO history, 4 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
19 Aug 2026PR03
Regular replenishment
5Rp 54,56123 Sept 202635 d
24 Nov 2025PR01
Import / long-lead
12Rp 52,02906 Oct 2026
open
316 d
18 Sept 2025PR03
Regular replenishment
12Rp 53,33609 Dec 202582 d
17 Aug 2025PR06
Regular replenishment
11Rp 52,09026 Sept 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026LowPX_KC-717Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
24 Jul 20261201000031020Corrective
24 Dec 20258201000007788Corrective
22 Dec 20251201000033960Corrective
27 Nov 20251201000037560Corrective
15 Sept 20258201000028192Corrective
22 Aug 20254201000034053Corrective