GASKET,SHEET,8IN,600#,PTFE
Material 4100014542 · GASKET · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100014542
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 12 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 32 d · P80 42 d
- Unit price
- Rp 65,332
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~32 days; expected demand during lead time 1.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 31.
- 5.Installed on 12 FuncLoc(s), 7 of them criticality A/B.
- 6.ML early warning: 52% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 8Single sourceOpen PO
On hand / on order
7 / 15
next delivery 05 Oct 2026
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 14
Rec. Max
31
order qty 16
Service level
100.0%
stockout risk now 0%
Unit price
Rp 65,332
PO history
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 112 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (8 units) excluded from the baseline.
Demand pattern Lumpy · 8 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 12 functional locations
7 with criticality A/B · 15 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_LCV-744 VD-1378 LEVEL CONTROL | A | 1 | 3 | 0.55 |
| PX_HE-949A SEAL OIL PREHEATER | A | 1 | 1 | 0.65 |
| PX_PP-535A CONDENSATE PUMP | A | 1 | 1 | 0.19 |
| PX_6-HS-12392-A21A-H PIPE-6 FROM HE-812B TO HE-1555A | A | 4 | 0 | 0.01 |
| PX_PRV-544A SAFETY VALVE PP-598B | A | 1 | 0 | 0.04 |
| PX_SDV-900 PP-1049 SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_4-HS-25642-B23A-T PIPE-4 FROM KC-222B TO KC-717 | B | 1 | 0 | 0.01 |
| PX_FCV-611A INHIBITOR FLOW CONTROL | C | 1 | 3 | 0.54 |
| PX_8-BF-2675-A11A PIPE-8 FROM HE-1813A TO VD-1010A | C | 1 | 0 | 0.01 |
| PX_LCV-1992B LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_ROF-1724A RESTRICTION ORIFICE | C | 1 | 0 | 0.00 |
| PX_PRV-499 SAFETY VALVE PP-1143B | S | 1 | 3 | 0.47 |
Lead time and procurement
Lead time 32 ± 13 days (PO history, 6 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Sept 2026 | PR06 Regular replenishment | 15 | Rp 66,160 | 05 Oct 2026 open | 25 d |
| 15 Jan 2026 | PR03 Regular replenishment | 19 | Rp 65,796 | 06 Mar 2026 | 50 d |
| 29 Dec 2025 | PR03 Regular replenishment | 19 | Rp 63,537 | 09 Feb 2026 | 42 d |
| 29 Dec 2025 | PR03 Regular replenishment | 8 | Rp 68,082 | 19 Jan 2026 | 21 d |
| 01 Dec 2025 | PR03 Regular replenishment | 19 | Rp 63,779 | 01 Jan 2026 | 31 d |
| 15 Jun 2025 | PR03 Regular replenishment | 18 | Rp 64,868 | 08 Jul 2025 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 May 2026 | Medium | PY_LCV-744 | LCV-744; small leak at packing |
| 07 May 2026 | Medium | PY_LCV-744 | Painting LCV-744 |
| 15 Apr 2026 | Low | PX_FCV-611A | Painting FCV-611A |
| 01 Apr 2026 | Low | PX_PRV-499 | Painting PRV-499 |
| 11 Jan 2026 | Medium | PX_PRV-499 | PRV-499 passing |
| 31 Oct 2025 | Medium | PX_FCV-611A | FCV-611A passing |
| 23 Jul 2025 | Low | PX_HE-949A | Leak from packing |
| 19 May 2025 | Medium | PX_PRV-499 | Recertification PRV-499 |
| 10 May 2025 | Medium | PX_PP-535A | Leak from packing |
| 06 May 2025 | Low | PX_FCV-611A | FCV-611A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Jun 2026 | 6 | 201000006766 | Corrective |
| 07 Jan 2026 | 1 | 201000009767 | Corrective |
| 28 Dec 2025 | 2 | 203000006078 | Turnaround |
| 11 Nov 2025 | 6 | 203000030064 | Turnaround |
| 31 Oct 2025 | 8 | 209000022917 | Other maintenance |
| 13 Oct 2025 | 5 | 201000030049 | Corrective |
| 23 Aug 2025 | 5 | 201000000748 | Corrective |
| 12 Aug 2025 | 8 | 201000039661 | Corrective |
| 04 Aug 2025 | 3 | 201000004842 | Corrective |
| 24 May 2025 | 2 | 204000003345 | Preventive |