GASKET,SHEET,3/4IN,300#,PTFE
Material 4100014553 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100014553
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (6 of 10 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- KARYA UTAMA GLOBAL PT
- Lead time
- 25 d · P80 28 d
- Unit price
- Rp 1.0M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 24 EA/year: 24 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~25 days; expected demand during lead time 1.6.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 32.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 32 now.
- 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
- 7.ML early warning: 75% probability of demand in the next 90 days.
Proposed purchase requisition
32 EA
Rp 32.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 10Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 12
Rec. Max
32
order qty 19
Service level
100.0%
stockout risk now 39%
Unit price
Rp 1.0M
PO history
ML early warning: 75% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 44 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (10 units) excluded from the baseline.
Demand pattern Intermittent · 12 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 10 functional locations
6 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-452 HYDROGEN FAN | A | 1 | 6 | 2.71 |
| PX_HE-888D FEED PREHEATER | A | 1 | 0 | 0.22 |
| PX_PP-891C CHARGE GAS PUMP | A | 1 | 0 | 0.19 |
| PX_PRV-156 SAFETY VALVE HE-980 | A | 1 | 0 | 0.04 |
| PX_VD-135A SEAL OIL DRUM | A | 1 | 0 | 0.08 |
| PX_PP-1536B DILUTION STEAM PUMP | C | 3 | 3 | 1.05 |
| PX_FCV-1504 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_VD-1129 SEAL OIL SURGE DRUM | C | 1 | 0 | 0.08 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 25 ± 11 days (PO history, 9 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Aug 2026 | PR01 Import / long-lead | 6 | Rp 1.0M | 02 Sept 2026 | 20 d |
| 13 Aug 2026 | PR03 Regular replenishment | 16 | Rp 1.0M | 02 Sept 2026 | 20 d |
| 26 May 2026 | PR06 Regular replenishment | 17 | Rp 1.0M | 11 Jun 2026 | 16 d |
| 25 May 2026 | PR04 Regular (other) | 7 | Rp 1.0M | 05 Jul 2026 | 41 d |
| 27 Dec 2025 | PR06 Regular replenishment | 11 | Rp 1.0M | 19 Jan 2026 | 23 d |
| 05 Dec 2025 | PR06 Regular replenishment | 9 | Rp 978,858 | 22 Dec 2025 | 17 d |
| 08 Oct 2025 | PR06 Regular replenishment | 10 | Rp 973,606 | 30 Oct 2025 | 22 d |
| 05 Jun 2025 | PR06 Regular replenishment | 11 | Rp 972,880 | 18 Jun 2025 | 13 d |
| 31 May 2025 | PR04 Regular (other) | 16 | Rp 1.0M | 05 Jul 2025 | 35 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2026 | Medium | PX_KC-452 | Overhaul |
| 05 Sept 2026 | Medium | PX_KC-452 | Inspect coupling KC-452 |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 20 Jan 2026 | Medium | PX_KC-452 | Replace lamp as per PM finding |
| 21 Nov 2025 | Medium | PX_KC-150A | KC-150A bearing temp high |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 16 Nov 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 03 Nov 2025 | Low | PX_PP-1536B | Leak from packing |
| 17 Oct 2025 | Low | PX_KC-452 | KC-452 bearing temp high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Aug 2026 | 3 | 201000002228 | Corrective |
| 24 Jun 2026 | 6 | 201000026692 | Corrective |
| 31 May 2026 | 1 | 201000010739 | Corrective |
| 25 Mar 2026 | 2 | 201000026823 | Corrective |
| 05 Jan 2026 | 3 | 201000011361 | Corrective |
| 05 Jan 2026 | 1 | 201000011361 | Corrective |
| 26 Dec 2025 | 4 | 201000017507 | Corrective |
| 13 Dec 2025 | 10 | 203000039452 | Turnaround |
| 05 Dec 2025 | 4 | 201000027213 | Corrective |
| 02 Dec 2025 | 1 | 201000010935 | Corrective |
| 03 Nov 2025 | 4 | 201000005391 | Corrective |
| 19 Sept 2025 | 4 | 209000019126 | Other maintenance |
| 01 Aug 2025 | 2 | 209000000237 | Other maintenance |
| 01 Jun 2025 | 4 | 204000027288 | Preventive |