GASKET,SHEET,3/4IN,300#,PTFE

Material 4100014553 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100014553
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 10 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA UTAMA GLOBAL PT
Lead time
25 d · P80 28 d
Unit price
Rp 1.0M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 24 EA/year: 24 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~25 days; expected demand during lead time 1.6.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 32.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 32 now.
  • 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
  • 7.ML early warning: 75% probability of demand in the next 90 days.
Proposed purchase requisition
32 EA
Rp 32.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 10Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 12
Rec. Max
32
order qty 19
Service level
100.0%
stockout risk now 39%
Unit price
Rp 1.0M
PO history
ML early warning: 75% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 44 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (10 units) excluded from the baseline.

Demand pattern Intermittent · 12 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 10 functional locations

6 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-452
HYDROGEN FAN
A162.71
PX_HE-888D
FEED PREHEATER
A100.22
PX_PP-891C
CHARGE GAS PUMP
A100.19
PX_PRV-156
SAFETY VALVE HE-980
A100.04
PX_VD-135A
SEAL OIL DRUM
A100.08
PX_PP-1536B
DILUTION STEAM PUMP
C331.05
PX_FCV-1504
CONTROL VALVE
C100.11
PX_VD-1129
SEAL OIL SURGE DRUM
C100.08
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 25 ± 11 days (PO history, 9 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
13 Aug 2026PR01
Import / long-lead
6Rp 1.0M02 Sept 202620 d
13 Aug 2026PR03
Regular replenishment
16Rp 1.0M02 Sept 202620 d
26 May 2026PR06
Regular replenishment
17Rp 1.0M11 Jun 202616 d
25 May 2026PR04
Regular (other)
7Rp 1.0M05 Jul 202641 d
27 Dec 2025PR06
Regular replenishment
11Rp 1.0M19 Jan 202623 d
05 Dec 2025PR06
Regular replenishment
9Rp 978,85822 Dec 202517 d
08 Oct 2025PR06
Regular replenishment
10Rp 973,60630 Oct 202522 d
05 Jun 2025PR06
Regular replenishment
11Rp 972,88018 Jun 202513 d
31 May 2025PR04
Regular (other)
16Rp 1.0M05 Jul 202535 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2026MediumPX_KC-452Overhaul
05 Sept 2026MediumPX_KC-452Inspect coupling KC-452
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Jan 2026MediumPX_KC-452Replace lamp as per PM finding
21 Nov 2025MediumPX_KC-150AKC-150A bearing temp high
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
03 Nov 2025LowPX_PP-1536BLeak from packing
17 Oct 2025LowPX_KC-452KC-452 bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
18 Aug 20263201000002228Corrective
24 Jun 20266201000026692Corrective
31 May 20261201000010739Corrective
25 Mar 20262201000026823Corrective
05 Jan 20263201000011361Corrective
05 Jan 20261201000011361Corrective
26 Dec 20254201000017507Corrective
13 Dec 202510203000039452Turnaround
05 Dec 20254201000027213Corrective
02 Dec 20251201000010935Corrective
03 Nov 20254201000005391Corrective
19 Sept 20254209000019126Other maintenance
01 Aug 20252209000000237Other maintenance
01 Jun 20254204000027288Preventive