GASKET,SHEET,3/4IN,150#,GRAPHITE

Material 4100014582 · GASKET · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100014582
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (12 of 17 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
30 d · P80 40 d
Unit price
Rp 669,765

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 17 EA/year: 17 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~30 days; expected demand during lead time 1.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 28.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 27 now.
  • 6.Installed on 17 FuncLoc(s), 12 of them criticality A/B.
  • 7.ML early warning: 63% probability of demand in the next 90 days.
Proposed purchase requisition
27 EA
Rp 18.1M · order by 01 Oct 2026
Expected arrival ≈ 30 days
Safety-critical (SCE)ML early warningSingle sourceAbnormal consumption
On hand / on order
1 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
28
order qty 18
Service level
100.0%
stockout risk now 44%
Unit price
Rp 669,765
PO history
ML early warning: 63% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 174 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Intermittent · 13 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 17 functional locations

12 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_FCV-1655A
HE-1843C OUTLET FLOW
A120.54
PX_SDV-289
C4 PRODUCT ISOLATION
A120.48
PX_FCV-1116
CONTROL VALVE
A100.11
PX_HE-574B
INHIBITOR TLE
A100.22
PX_LCV-1441A
HE-961B LEVEL CONTROL
A100.12
PX_PCV-1965C
HE-1941 PRESSURE CONTROL
A100.08
PY_VD-1729
METHANE KO DRUM
A100.08
PX_HE-1788D
GASOLINE EXCHANGER
B100.22
PX_SDV-1540
PP-1250 SHUTDOWN VALVE
B100.06

Lead time and procurement

Lead time 30 ± 13 days (PO history, 7 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
21 Apr 2026PR03
Regular replenishment
8Rp 679,61508 May 202617 d
06 Feb 2026PR03
Regular replenishment
11Rp 669,76526 Feb 202620 d
17 Dec 2025PR03
Regular replenishment
10Rp 670,09904 Feb 202649 d
09 Dec 2025PR06
Regular replenishment
7Rp 667,12120 Jan 202642 d
26 May 2025PR03
Regular replenishment
19Rp 642,45015 Jun 202520 d
17 May 2025PR03
Regular replenishment
12Rp 673,70416 Jun 202530 d
15 May 2025PR03
Regular replenishment
19Rp 658,50212 Jun 202528 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
28 Sept 2026MediumPX_TCV-1934TCV-1934; IA leak from regulator
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
10 Sept 2026MediumPX_BF-111Peep door broken BF-111

Recent goods issues

Posting dateQtyOrderOrder type
10 Apr 20262201000034612Corrective
13 Feb 20262203000018609Turnaround
15 Jan 20262201000025741Corrective
14 Jan 20264201000025741Corrective
17 Dec 20252201000034636Corrective
03 Nov 20253201000038265Corrective
25 Sept 202510203000003244Turnaround
10 Sept 20252201000007004Corrective
20 Aug 20259201000036041Corrective
31 Jul 20252209000022794Other maintenance
27 Jul 20251204000039947Preventive
13 Jul 20251201000007754Corrective
27 Jun 20254201000002983Corrective
22 Jun 20251201000032173Corrective
14 Jun 20251201000029407Corrective