GASKET,RING,10IN,150#,GRAPHITE

Material 4100014625 · GASKET · Plant 1000

ASafety-criticalReduceExcess
Material
4100014625
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 15 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 30 EA/year: 27 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
  • 3.Lead time ~31 days; expected demand during lead time 2.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 48.
  • 5.Stock 51 exceeds the level to keep (48) by 3.
  • 6.Installed on 15 FuncLoc(s), 8 of them criticality A/B.
  • 7.ML early warning: 56% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 20Price estimatedLead time estimated
On hand / on order
51 / 0
no open PO
Today Min / Max
8 / 22
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 16
Rec. Max
48
order qty 30
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 21 days ago, 5 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (20 units) excluded from the baseline.

Demand pattern Intermittent · 8 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 15 functional locations

8 with criticality A/B · 26 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-1475
C3 RECYCLE STRIPPER
A120.81
PX_HE-1842D
FUEL OIL COOLER
A300.22
PX_HE-605
WASH WATER EXCHANGER
A100.22
PX_VD-1416A
ETHYLENE SEPARATOR
A100.08
PX_PCV-1460
BY PASS DUCT
B471.79
PX_PP-339A
METHANE PUMP
B162.33
PX_HE-1372D
INHIBITOR COOLER
B131.08
PX_VD-1292
GASOLINE SEPARATOR
B100.08
PX_HE-668D
HYDROGEN COOLER
C320.65
PX_LCV-1273
PP-200D LEVEL CONTROL
C100.12
PX_KT-202
TURBINE FOR KC-202
S242.81
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
02 Mar 2027PX_PP-339APump overhaul0.72
07 Jul 2027PX_KC-505DCompressor major overhaul1.43

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
13 Sept 2026MediumPX_PCV-1460PCV-1460 passing
01 Sept 2026MediumPX_PCV-1460Install scaffolding at PCV-1460
30 Aug 2026EmergencyPX_CL-1475Replace lamp as per PM finding
18 Aug 2026MediumPX_HE-1372DHE-1372D fouling
19 Jul 2026LowPX_PP-339APP-339A seal leak
11 Jun 2026LowPX_KT-264ALeak from packing
27 May 2026MediumPX_PP-339APP-339A seal leak
09 May 2026MediumPX_HE-1372DRetubing HE-1372D
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A

Recent goods issues

Posting dateQtyOrderOrder type
10 Sept 20262201000020312Corrective
29 Aug 20269201000007716Corrective
27 Feb 20262201000019616Corrective
26 Feb 20265201000019616Corrective
24 Nov 20255201000029029Corrective
21 Nov 20258203000020131Turnaround
19 Nov 202512203000038363Turnaround
08 Oct 20251201000005238Corrective
30 Sept 20257201000037504Corrective
25 Jul 20255201000027278Corrective