GASKET,SHEET,10IN,150#,GRAPHITE

Material 4100014698 · GASKET · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100014698
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
PRIMA LOGAM NUSANTARA PT
Lead time
29 d · P80 36 d
Unit price
Rp 214,359

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.5 EA/year: 2.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~29 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
4 EA
Rp 857,434 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Safety-critical (SCE)ML early warningLast turnaround used 10Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 1%
Unit price
Rp 214,359
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 156 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (10 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 644.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-397A
DILUTION STEAM FAN
A310.57
PX_PP-915A
BOTTOM PUMP
A100.19
PX_PRV-371
SAFETY VALVE VD-462
A100.04
PX_HE-239D
RECYCLE ETHANE TLE
C151.08
PX_PRV-1934
SAFETY VALVE VD-1338
C100.04

Lead time and procurement

Lead time 29 ± 20 days (PO history, 8 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR03
Regular replenishment
4Rp 219,80425 Sept 202611 d
20 Apr 2026PR01
Import / long-lead
7Rp 212,07605 Jul 202676 d
11 Feb 2026PR03
Regular replenishment
5Rp 223,08526 Feb 202615 d
28 Jan 2026PR03
Regular replenishment
2Rp 208,09020 Feb 202623 d
15 Jan 2026PR03
Regular replenishment
7Rp 216,64128 Feb 202644 d
10 Jan 2026PR03
Regular replenishment
2Rp 211,93325 Jan 202615 d
26 Oct 2025PR03
Regular replenishment
3Rp 211,74720 Nov 202525 d
31 May 2025PR03
Regular replenishment
6Rp 224,42020 Jun 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026MediumPX_HE-239DReplace lamp as per PM finding
09 Feb 2026LowPX_HE-239DInstall scaffolding at HE-239D
04 Nov 2025MediumPX_HE-239DReplace lamp as per PM finding
25 Oct 2025EmergencyPX_HE-239DInstall scaffolding at HE-239D
02 Jul 2025LowPX_KC-397APainting KC-397A
27 May 2025MediumPX_HE-239DHE-239D tube leak

Recent goods issues

Posting dateQtyOrderOrder type
28 Apr 20262201000020066Corrective
25 Jan 20261201000028000Corrective
12 Jan 20261201000003024Corrective
21 Nov 20251201000025223Corrective
08 Nov 202510203000029164Turnaround