GASKET,SW,2IN,150#,PTFE

Material 4100014709 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100014709
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
23 d · P80 24 d
Unit price
Rp 1.6M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 7.6 EA/year: 7.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 0.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 15.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 15 now.
  • 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
15 EA
Rp 24.1M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Convert to Stock ItemLast turnaround used 12Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
15
order qty 8
Service level
100.0%
stockout risk now 13%
Unit price
Rp 1.6M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Lumpy · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 747.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 10 functional locations

6 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A362.81
PX_HE-1074
C3 RECYCLE REBOILER
A131.08
PX_HE-232C
ETHYLENE PREHEATER
A100.22
PX_HE-301B
FUEL OIL REBOILER
A200.22
PX_KC-669
DEMIN WATER BLOWER
A100.57
PX_HE-1647D
BOTTOM COOLER
B100.22
PX_4-MS-25646-A22A-HS
PIPE-4 FROM KC-155D TO PP-304
C100.01
PX_BF-101
CRACKING FURNACE BF-101
S283.02
PX_PRV-1448
SAFETY VALVE PP-752B
S100.04
PX_PRV-182B
SAFETY VALVE PP-700
S100.04

Lead time and procurement

Lead time 23 ± 12 days (PO history, 5 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
19 Mar 2026PR06
Regular replenishment
6Rp 1.6M31 Mar 202612 d
26 Oct 2025PR06
Regular replenishment
8Rp 1.6M13 Nov 202518 d
14 Jul 2025PR06
Regular replenishment
8Rp 1.6M19 Jul 20255 d
03 Jul 2025PR05
Project / turnaround
5Rp 1.6M03 Aug 202531 d
17 May 2025PR03
Regular replenishment
6Rp 1.7M08 Jun 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
02 Jul 2026LowPX_HE-1074Install scaffolding at HE-1074
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
22 Mar 2026LowPX_HE-1074Cleaning HE-1074
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
20 Nov 2025MediumPX_KT-419ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Jan 20262201000008094Corrective
03 Jan 20264201000031670Corrective
31 Dec 20251201000038032Corrective
14 Nov 20254203000023445Turnaround
05 Nov 20258203000029164Turnaround
07 Aug 20255201000002003Corrective
11 Jun 20251201000027597Corrective