GASKET,SW,12IN,150#,GRAPHITE
Material 4100014740 · GASKET · Plant 1000
ASafety-criticalReorderCriticalBelow reorder point
- Material
- 4100014740
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 12 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 32 d · P80 48 d
- Unit price
- Rp 214,549
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 16 EA/year: 15 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 3.Lead time ~32 days; expected demand during lead time 2.1 (incl. 0.7 planned).
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 29.
- 5.On hand 1 + on order 0 is at or below the reorder point: order 28 now.
- 6.Installed on 12 FuncLoc(s), 8 of them criticality A/B.
- 7.ML early warning: 69% probability of demand in the next 90 days.
Proposed purchase requisition
28 EA
Rp 6.0M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Safety-critical (SCE)ML early warningLast turnaround used 2Single sourceAbnormal consumptionPlanned demand in lead time
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 10
Rec. Max
29
order qty 17
Service level
100.0%
stockout risk now 40%
Unit price
Rp 214,549
PO history
ML early warning: 69% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 56 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 8 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 12 functional locations
8 with criticality A/B · 17 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_SDV-245 ON-OFF VALVE | A | 1 | 1 | 0.06 |
| PX_PRV-1193 SAFETY VALVE PP-1881A | A | 4 | 0 | 0.04 |
| PX_PP-1155C CONDENSATE PUMP | B | 1 | 9 | 3.19 |
| PX_HE-554 CHARGE GAS TLE | B | 1 | 2 | 0.65 |
| PX_HE-1462 LEAN AMINE COOLER | B | 1 | 0 | 0.22 |
| PX_HE-495C CAUSTIC TLE | B | 1 | 0 | 0.22 |
| PX_PP-1352 LUBE OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-1177 METHANE PUMP | C | 1 | 1 | 0.62 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
| PX_KT-778A TURBINE FOR KC-778A | S | 3 | 0 | 1.10 |
| PX_SDV-1224 COOLING WATER ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 32 ± 21 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Apr 2026 | PR06 Regular replenishment | 10 | Rp 218,558 | 02 May 2026 | 28 d |
| 15 Jul 2025 | PR06 Regular replenishment | 4 | Rp 214,549 | 24 Jul 2025 | 9 d |
| 11 May 2025 | PR05 Project / turnaround | 11 | Rp 210,938 | 11 Jul 2025 | 61 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_SDV-245 | Final Element Overhaul; ONOFFV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 13 Sept 2026 | Medium | PX_HE-554 | Cleaning HE-554 |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 20 Jun 2026 | High | PX_PP-1155C | Overhaul PP-1155C |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 20 May 2026 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Aug 2026 | 2 | 201000036260 | Corrective |
| 05 Jul 2026 | 2 | 201000010512 | Corrective |
| 22 May 2026 | 5 | 201000002999 | Corrective |
| 22 May 2026 | 2 | 201000002999 | Corrective |
| 21 Apr 2026 | 5 | 201000011242 | Corrective |
| 17 Feb 2026 | 3 | 201000034591 | Corrective |
| 16 Dec 2025 | 2 | 201000036707 | Corrective |
| 22 Nov 2025 | 2 | 203000033105 | Turnaround |
| 12 May 2025 | 2 | 201000000876 | Corrective |
| 11 May 2025 | 1 | 201000029055 | Corrective |