GASKET,SW,4IN,150#,GRAPHITE

Material 4100014754 · GASKET · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100014754
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 20 EA/year: 20 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 1.7.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 32.
  • 5.On hand 6 + on order 0 is at or below the reorder point: order 26 now.
  • 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
26 EA
Rp 5.6M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 10
Rec. Max
32
order qty 21
Service level
100.0%
stockout risk now 3%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 10 functional locations

6 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_PP-1577D
ETHYLENE PUMP
B121.05
PX_3-MS-14704-A11A-T
PIPE-3 FROM VD-1070A TO PP-1320D
B100.01
PX_HE-935A
LUBE OIL CONDENSER
B100.22
PX_TCV-931A
TEMPERATURE CONTROL VALVE
C120.55
PX_BF-111-DUCT16
CONVECTION SECTION
S100.45
PX_SDV-1160
HE-1482D SHUTDOWN VALVE
S100.06
PX_SDV-1973A
COOLING WATER ISOLATION
S100.06

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
07 Sept 2026MediumPX_PP-1577DReplace bearing PP-1577D
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112

Recent goods issues

Posting dateQtyOrderOrder type
19 Apr 20261201000032168Corrective
12 Feb 20262201000008089Corrective
14 Jan 20264201000026129Corrective
28 Aug 20254201000024368Corrective