Sparely
DU

GASKET,SW,1-1/2IN,300#,PTFE

Material 4100014772 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100014772
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 9 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
35 d · P80 51 d
Unit price
Rp 32,558

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~35 days; expected demand during lead time 0.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
  • 7.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 195,348 · order by 01 Oct 2026
Expected arrival ≈ 35 days
Safety-critical (SCE)ML early warningConvert to Stock ItemSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 32,558
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 556.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 9 functional locations

6 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-316D
METHANOL FAN
A151.43
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PP-489A
RICH AMINE PUMP
A100.19
PX_BF-111-BRN05
DILUTION STEAM TO MIXED FEED COIL
B110.45
PX_12-BF-24554-A11A-HS
PIPE-12 FROM HE-530D TO PP-688
B400.01
PY_HE-1664
ETHYLENE COOLER
B100.22
PX_4-DS-17552-B23A-T
PIPE-4 FROM PP-1721A TO PP-1694A
C100.01
PX_FCV-129D
BY PASS LINE
C100.11
PX_SDV-205
HE-1703C SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 35 ± 16 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
11 Apr 2026PR06
Regular replenishment
1Rp 32,20821 May 202640 d
16 Nov 2025PR06
Regular replenishment
4Rp 32,90826 Dec 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Aug 2026MediumPX_KC-316DOverhaul
03 Aug 2026MediumPX_KC-316DPainting KC-316D
14 May 2026MediumPX_KC-316DKC-316D high vibration
24 Apr 2026LowPX_KC-316DInstall scaffolding at KC-316D
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
14 Jun 2025MediumPX_KC-316DInstall scaffolding at KC-316D
05 May 2025MediumPX_BF-111-BRN05Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
14 Jan 20261201000039504Corrective
08 Jan 20262201000013162Corrective
13 May 20251201000028813Corrective
12 May 20253201000028813Corrective