GASKET,SW,1/2IN,300#,GRAPHITE
Material 4100014806 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100014806
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 27 EA/year: 27 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 2.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 45.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 42 now.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
42 EA
Rp 9.0M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
45
order qty 28
Service level
100.0%
stockout risk now 42%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 318 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_HE-314B ETHYLENE CONDENSER | A | 1 | 3 | 1.08 |
| PX_PCV-861B BY PASS DUCT | A | 1 | 0 | 0.08 |
| PX_3-P-28152-A22A-HS PIPE-3 FROM HE-706A TO CL-658 | C | 1 | 0 | 0.01 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
| 08 Sept 2026 | Medium | PX_BF-106 | Painting BF-106 |
| 03 Sept 2026 | Medium | PX_BF-106 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Nov 2025 | 2 | 201000028386 | Corrective |
| 31 Aug 2025 | 1 | 201000037253 | Corrective |
| 31 Aug 2025 | 4 | 201000037253 | Corrective |
| 10 Aug 2025 | 2 | 201000032179 | Corrective |
| 29 May 2025 | 8 | 201000027735 | Corrective |