GASKET,SW,1/2IN,300#,GRAPHITE

Material 4100014806 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100014806
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 27 EA/year: 27 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 2.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 45.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 42 now.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
42 EA
Rp 9.0M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
45
order qty 28
Service level
100.0%
stockout risk now 42%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 318 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_HE-314B
ETHYLENE CONDENSER
A131.08
PX_PCV-861B
BY PASS DUCT
A100.08
PX_3-P-28152-A22A-HS
PIPE-3 FROM HE-706A TO CL-658
C100.01
PX_KT-447
TURBINE FOR KC-447
S1136.24

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106
03 Sept 2026MediumPX_BF-106Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
17 Nov 20252201000028386Corrective
31 Aug 20251201000037253Corrective
31 Aug 20254201000037253Corrective
10 Aug 20252201000032179Corrective
29 May 20258201000027735Corrective