GASKET,RING,12IN,600#,PTFE
Material 4100014829 · GASKET · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100014829
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 12 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 33 d · P80 39 d
- Unit price
- Rp 291,477
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 20 EA/year: 20 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~33 days; expected demand during lead time 1.8.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 37.
- 5.On hand 2 + on order 13 is at or below the reorder point: order 22 now.
- 6.Installed on 12 FuncLoc(s), 6 of them criticality A/B.
- 7.ML early warning: 63% probability of demand in the next 90 days.
Proposed purchase requisition
22 EA
Rp 6.4M · order by 01 Oct 2026
Expected arrival ≈ 33 days
Safety-critical (SCE)ML early warningSingle sourceOpen PO
On hand / on order
2 / 13
next delivery 05 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 15
Rec. Max
37
order qty 21
Service level
100.0%
stockout risk now 0%
Unit price
Rp 291,477
PO history
ML early warning: 63% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 117 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (6 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 12 functional locations
6 with criticality A/B · 17 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_HE-884B RECYCLE ETHANE TLE | A | 1 | 2 | 1.08 |
| PX_KC-106B GASOLINE BLOWER | A | 3 | 2 | 1.00 |
| PX_KC-464A CONDENSATE BLOWER | A | 3 | 2 | 1.43 |
| PX_PRV-1429A SAFETY VALVE KC-155 | A | 1 | 0 | 0.04 |
| PX_SDV-668 LUBE OIL ISOLATION | B | 2 | 0 | 0.06 |
| PX_HE-1368C DILUTION STEAM TLE | C | 1 | 4 | 1.50 |
| PY_LCV-1952 VD-125 LEVEL CONTROL | C | 1 | 2 | 0.97 |
| PX_KC-582B CAUSTIC BLOWER | S | 1 | 10 | 3.57 |
| PX_CL-443 COOLING WATER SCRUBBER | S | 1 | 6 | 2.52 |
| PX_PRV-376 SAFETY VALVE HE-1061B | S | 1 | 4 | 0.90 |
| PX_FCV-1905D HE-163D OUTLET FLOW | S | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 33 ± 14 days (PO history, 5 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Sept 2026 | PR03 Regular replenishment | 9 | Rp 291,477 | 07 Oct 2026 open | 26 d |
| 30 Aug 2026 | PR03 Regular replenishment | 4 | Rp 293,323 | 05 Oct 2026 open | 36 d |
| 22 Mar 2026 | PR04 Regular (other) | 9 | Rp 277,264 | 14 May 2026 | 53 d |
| 17 Dec 2025 | PR01 Import / long-lead | 8 | Rp 276,551 | 08 Jan 2026 | 22 d |
| 09 Jul 2025 | PR06 Regular replenishment | 5 | Rp 294,986 | 13 Aug 2025 | 35 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_PRV-376 | PRV-376 passing |
| 12 Sept 2026 | Low | PX_PRV-376 | Install scaffolding at PRV-376 |
| 03 Sept 2026 | Medium | PX_CL-443 | Replace lamp as per PM finding |
| 01 Sept 2026 | High | PX_KC-582B | KC-582B high vibration |
| 26 Aug 2026 | Low | PX_KC-582B | Painting KC-582B |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 18 Jul 2026 | Medium | PX_HE-1368C | HE-1368C fouling |
| 09 Jul 2026 | High | PX_CL-443 | CL-443 DP high |
| 08 Jul 2026 | Low | PX_KC-582B | Install scaffolding at KC-582B |
| 25 Jun 2026 | Medium | PX_CL-443 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Jun 2026 | 1 | 204000030837 | Preventive |
| 24 May 2026 | 5 | 204000015387 | Preventive |
| 18 May 2026 | 3 | 201000025183 | Corrective |
| 02 May 2026 | 1 | 201000030476 | Corrective |
| 19 Dec 2025 | 8 | 201000033521 | Corrective |
| 30 Jul 2025 | 5 | 201000017540 | Corrective |
| 22 May 2025 | 6 | 203000004890 | Turnaround |