GASKET,SHEET,1IN,600#,GR/304

Material 4100014858 · GASKET · Plant 1000

AMonitorHealthy
Material
4100014858
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 8.8 EA/year: 8.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 18.
  • 4.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Last turnaround used 2Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
18
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 8 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 940.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 9 functional locations

6 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1660A
REFLUX CONDENSER
A152.36
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PP-779A
LUBE OIL PUMP
A120.62
PX_KC-621
SEAL OIL FAN
A100.57
PX_VD-1864
FUEL OIL SEPARATOR
A100.08
PX_MOV-917D
MOTOR OPERATED GATE VALVE
B130.48
PX_FCV-580A
HE-108B OUTLET FLOW
C100.11
PX_VD-1286B
DILUTION STEAM SURGE DRUM
C100.08
PX_CL-1165
HYDROGEN TOWER
S151.23

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_MOV-917DLeak from packing
15 Sept 2026EmergencyPX_HE-1660A[MSI-B-26-ZCD-129] Permanent repair
08 May 2026MediumPX_MOV-917DInstall scaffolding at MOV-917D
29 Apr 2026MediumPX_PP-779AReplace bearing PP-779A
25 Mar 2026MediumPX_HE-1660ACleaning HE-1660A
13 Jan 2026HighPX_CL-1165Install scaffolding at CL-1165
13 Jan 2026MediumPX_HE-1660ALeak from packing
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
07 Dec 2025MediumPX_CL-1165Replace lamp as per PM finding
01 Dec 2025MediumPX_CL-1165Install scaffolding at CL-1165

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 20265202000000410Emergency
31 Dec 20251201000019150Corrective
21 Nov 20252203000020131Turnaround
09 Sept 20251201000014582Corrective
21 Jun 20255201000003270Corrective