GASKET,SHEET,10IN,600#,PTFE

Material 4100014913 · GASKET · Plant 1000

AReorderNormalBelow reorder point
Material
4100014913
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 38 EA/year: 38 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 3.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 56.
  • 4.On hand 6 + on order 0 is at or below the reorder point: order 50 now.
  • 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
50 EA
Rp 10.7M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Last turnaround used 16Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 14
Rec. Max
56
order qty 39
Service level
99.9%
stockout risk now 26%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 28 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (16 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

5 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_KC-752A
CONDENSATE BLOWER
A141.85
PX_PP-651A
BOTTOM PUMP
A100.19
PX_HE-1813A
DEMIN WATER REBOILER
B131.50
PX_16-MS-22546-A51A-H
PIPE->16 FROM VD-213 TO KC-222B
C100.01

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026HighPX_HE-1813ACleaning HE-1813A
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000012524Corrective
17 Feb 20264204000011759Preventive
10 Nov 20256203000033996Turnaround
10 Nov 202510203000033996Turnaround
01 Aug 20254201000039898Corrective