GASKET,SW,1-1/2IN,150#,GR/304

Material 4100014935 · GASKET · Plant 1000

ASafety-criticalReduceExcess
Material
4100014935
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 9 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
31 d · P80 43 d
Unit price
Rp 136,706

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.2 EA/year: 5.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
  • 5.Stock 14 exceeds the level to keep (12) by 2.
  • 6.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
14 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
100.0%
stockout risk now 0%
Unit price
Rp 136,706
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 98 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 831.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 9 functional locations

5 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_PP-1396A
CAUSTIC PUMP
A151.47
PX_PCV-1621
VD-532 PRESSURE CONTROL
A100.08
PX_PP-1865A
METHANOL PUMP
A100.19
PX_HE-1158A
CHARGE GAS COOLER
B110.65
PX_HE-1459D
SEAL OIL CONDENSER
C120.65
PX_PCV-1584A
HE-495C PRESSURE CONTROL
C100.08
PX_PRV-916
SAFETY VALVE HE-118B
S100.04
PX_VD-462
SEAL OIL KO DRUM
S100.08

Lead time and procurement

Lead time 31 ± 15 days (PO history, 4 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
18 Mar 2026PR04
Regular (other)
4Rp 135,52702 May 202645 d
09 Jan 2026PR06
Regular replenishment
1Rp 140,74322 Jan 202613 d
05 Nov 2025PR06
Regular replenishment
2Rp 137,10130 Nov 202525 d
26 Jun 2025PR06
Regular replenishment
3Rp 136,31106 Aug 202541 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_HE-1459DHE-1459D fouling
29 Jul 2026MediumPX_PP-1396AOil leak at PP-1396A bearing housing
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
06 May 2026MediumPX_PP-1396ALeak from packing
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
22 Oct 2025HighPX_PP-1396AInstall scaffolding at PP-1396A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
02 Sept 2025MediumPX_PP-1396APP-1396A discharge pressure low

Recent goods issues

Posting dateQtyOrderOrder type
25 Jun 20262201000016931Corrective
24 Jan 20261201000028000Corrective
01 Jan 20261201000002186Corrective
26 Jun 20254201000014526Corrective