Material 4100014949 · GASKET · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100014949
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PRIMA INDUSTRI MAKMUR PT
Lead time
37 d · P80 56 d
Unit price
Rp 104,600

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 12 EA/year: 12 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~37 days; expected demand during lead time 1.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 22.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 21 now.
  • 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 54% probability of demand in the next 90 days.
Proposed purchase requisition
21 EA
Rp 2.2M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
22
order qty 13
Service level
99.9%
stockout risk now 34%
Unit price
Rp 104,600
PO history
ML early warning: 54% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 18 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PCV-380
HE-1557D PRESSURE CONTROL
A300.08
PX_HE-457D
METHANOL PREHEATER
B141.50
PX_6-MS-7009-A41A-HS
PIPE-6 FROM HE-1703C TO PP-841B
C300.01
PX_SDV-1695B
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 37 ± 18 days (PO history, 3 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
22 May 2026PR03
Regular replenishment
7Rp 103,04823 Jul 202662 d
04 Feb 2026PR06
Regular replenishment
2Rp 104,60026 Feb 202622 d
25 Sept 2025PR03
Regular replenishment
6Rp 107,39710 Nov 202546 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026MediumPX_HE-457DCleaning HE-457D
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
23 Feb 2026MediumPX_HE-457DHE-457D fouling
25 Dec 2025HighPX_HE-457DRetubing HE-457D
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
15 May 2025LowPX_KT-419APSM25/Leak from packing
03 May 2025MediumPX_HE-457DPSM25/Painting HE-457D

Recent goods issues

Posting dateQtyOrderOrder type
13 Sept 20265201000010974Corrective
05 Aug 20264201000010969Corrective
24 Jul 20261201000037006Corrective
22 Dec 20254201000006328Corrective
27 May 20251201000012634Corrective