GASKET,SHEET,8IN,150#,PTFE
Material 4100014955 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100014955
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 4.4 EA/year: 4.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 11.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 7 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Last turnaround used 6Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
11
order qty 5
Service level
100.0%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 220 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (6 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 475.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PX_CL-658 RICH AMINE STRIPPER | A | 1 | 1 | 0.38 |
| PX_HE-713D RICH AMINE CONDENSER | A | 1 | 1 | 0.22 |
| UT_VD-1010A REFLUX KO DRUM | A | 1 | 0 | 0.08 |
| PX_BF-106-COIL24 CONVECTION SECTION | C | 1 | 0 | 0.45 |
| PX_PP-1768C RICH AMINE PUMP | S | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Sept 2026 | Medium | PX_PP-1768C | Replace lamp as per PM finding |
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 12 Aug 2025 | Medium | PX_CL-658 | Install scaffolding at CL-658 |
| 25 May 2025 | Low | PX_PP-1768C | Oil leak at PP-1768C bearing housing |
| 07 May 2025 | Medium | PX_HE-713D | Leak from packing |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Feb 2026 | 2 | 201000015990 | Corrective |
| 07 Jan 2026 | 3 | 201000031110 | Corrective |
| 27 Nov 2025 | 6 | 203000032713 | Turnaround |
| 02 Jun 2025 | 4 | 201000026623 | Corrective |