GASKET,SHEET,8IN,300#,GR/304

Material 4100014970 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100014970
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 10 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
52 d · P80 88 d
Unit price
Rp 32,960

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.9 EA/year: 5.9 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~52 days; expected demand during lead time 0.8.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 18.
  • 5.On hand 4 + on order 6 is at or below the reorder point: order 8 now.
  • 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
  • 7.ML early warning: 50% probability of demand in the next 90 days.
Proposed purchase requisition
8 EA
Rp 263,680 · order by 01 Oct 2026
Expected arrival ≈ 52 days
Safety-critical (SCE)ML early warningSingle sourceOpen PO
On hand / on order
4 / 6
next delivery 22 Nov 2026
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
18
order qty 6
Service level
100.0%
stockout risk now 0%
Unit price
Rp 32,960
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 273 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 501.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 10 functional locations

6 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-650
BY PASS DUCT
A100.08
PX_HE-1890C
REFLUX CONDENSER
B141.93
PX_HE-822
RICH AMINE PREHEATER
B110.22
PX_ROF-701D
RESTRICTION ORIFICE
B110.00
PX_PRV-227
SAFETY VALVE PP-779A
B100.04
PX_ROF-1788
MP STEAM TO PP-490A
B300.00
PX_HE-844A
SEAL OIL TLE
C100.22
PX_ROF-916
MP STEAM TO VD-708
C200.00
PX_PRV-822C
SAFETY VALVE HE-895C
S100.04
PY_PRV-1062A
SAFETY VALVE HE-912
S100.04

Lead time and procurement

Lead time 52 ± 22 days (PO history, 5 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
28 Aug 2026PR03
Regular replenishment
6Rp 32,17722 Nov 2026
open
86 d
18 Apr 2026PR03
Regular replenishment
7Rp 32,54005 Jun 202648 d
11 Feb 2026PR03
Regular replenishment
3Rp 33,90716 Apr 202664 d
03 Feb 2026PR06
Regular replenishment
5Rp 33,48808 May 202694 d
13 Aug 2025PR03
Regular replenishment
5Rp 32,96013 Sept 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026MediumPX_HE-1890CRetubing HE-1890C
25 May 2026MediumPX_HE-1890CHE-1890C tube leak
23 Feb 2026MediumPX_HE-1890CHE-1890C fouling
28 Jun 2025MediumPX_HE-1890CHE-1890C tube leak
27 May 2025HighPX_HE-822Retubing HE-822
18 May 2025LowPX_ROF-701DInstall scaffolding at ROF-701D

Recent goods issues

Posting dateQtyOrderOrder type
01 Jan 20262201000038744Corrective
10 Dec 20256201000037133Corrective
05 Oct 20253201000016100Corrective
10 Jul 20254201000003955Corrective