GASKET,SW,1/4IN,300#,PTFE

Material 4100014997 · GASKET · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100014997
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 11 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 20 EA/year: 20 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 1.7.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 35.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 33 now.
  • 6.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
  • 7.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
33 EA
Rp 7.1M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 13
Rec. Max
35
order qty 21
Service level
99.9%
stockout risk now 31%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 115 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 11 functional locations

8 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_FCV-723
C3 RECYCLE FLOW CONTROL
A120.54
PX_PP-1121
DILUTION STEAM PUMP
A120.62
PX_PP-1801A
DEMIN WATER PUMP
A110.19
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_LCV-173
LEVEL CONTROL VALVE
A100.12
PX_PP-1865A
METHANOL PUMP
A100.19
PX_PRV-495C
SAFETY VALVE CL-883
A100.04
PX_FCV-1463A
PP-1775A OUTLET FLOW
C100.11
PY_VD-1614
BFW ACCUMULATOR
C200.08
PX_KC-773A
REFLUX COMPRESSOR
S3259.99

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026EmergencyPX_KC-773AInspect coupling KC-773A
15 Sept 2026LowPX_KC-773AInstall scaffolding at KC-773A
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high
07 Sept 2026LowPX_FCV-723[MSI-B-26-SFU-129/M] Replace line
26 Aug 2026MediumPX_PP-1121Oil leak at PP-1121 bearing housing
23 Aug 2026LowPX_KC-773AKC-773A bearing temp high
18 Aug 2026LowPX_KC-479CLeak from packing
10 Aug 2026LowPX_KC-773AKC-773A high vibration
09 Aug 2026MediumPX_KC-773AInspect coupling KC-773A
03 Aug 2026MediumPX_KC-773ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
08 Jun 20262201000029185Corrective
08 Jun 20261201000029185Corrective
07 Jun 20262201000029185Corrective
03 Apr 20269205000024821Other maintenance