GASKET,SHEET,12IN,150#,GRAPHITE

Material 4100015015 · GASKET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100015015
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 7 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
PRIMA UTAMA PRATAMA PT
Lead time
21 d · P80 16 d
Unit price
Rp 562,942

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.7 EA/year: 3.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~21 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 7.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 7 now.
  • 6.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
7 EA
Rp 3.9M · order by 01 Oct 2026
Expected arrival ≈ 21 days
Safety-critical (SCE)ML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
7
order qty 4
Service level
99.9%
stockout risk now 14%
Unit price
Rp 562,942
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 135 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (22 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 889.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 7 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1949C
SAFETY VALVE VD-185
A120.04
PX_BF-102-PD05
PEEP DOOR
A100.45
PX_FCV-574
PP-1805A OUTLET FLOW
A100.11
PX_PCV-392A
BY PASS DUCT
A100.08
PX_HE-108B
SLOP OIL TLE
B110.22
PX_BF-108
CRACKING FURNACE BF-108
S1239.44
PX_PRV-532
SAFETY VALVE PP-1570A
S100.04

Lead time and procurement

Lead time 21 ± 10 days (PO history, 4 PO lines) · on-time 48%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jul 2026PR06
Regular replenishment
10Rp 568,46825 Jul 202616 d
06 Apr 2026PR03
Regular replenishment
11Rp 587,40216 Apr 202610 d
16 Dec 2025PR06
Regular replenishment
6Rp 557,41524 Dec 20258 d
17 Nov 2025PR06
Regular replenishment
11Rp 550,43704 Dec 202517 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
19 May 20262201000033326Corrective
22 Aug 20251201000007042Corrective
16 Aug 20251201000001187Corrective
30 Jul 202522203000033054Turnaround