GASKET,RING,1/2IN,300#,GRAPHITE
Material 4100015032 · GASKET · Plant 1000
AMonitorSlow-moving
- Material
- 4100015032
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 43 d · P80 51 d
- Unit price
- Rp 142,357
Recommendation
- 1.Forecast 0.9 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~43 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 54% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
3 / 5
next delivery 11 Oct 2026
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 142,357
PO history
ML early warning: 54% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (20 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 21.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-194 HE-1680D PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_FCV-1719A LEAN AMINE FLOW CONTROL | B | 1 | 2 | 0.54 |
| PX_ROF-245B LP STEAM TO KC-942D | C | 1 | 0 | 0.00 |
| PX_KC-505D METHANE COMPRESSOR | S | 1 | 1 | 1.00 |
Lead time and procurement
Lead time 43 ± 16 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Aug 2026 | PR03 Regular replenishment | 5 | Rp 141,902 | 11 Oct 2026 open | 49 d |
| 05 Jan 2026 | PR04 Regular (other) | 9 | Rp 142,812 | 20 Mar 2026 | 74 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 07 Jul 2027 | PX_KC-505D | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2025 | Low | PX_FCV-1719A | FCV-1719A passing |
| 21 Jun 2025 | High | PX_KC-505D | Repair insulation KC-505D |
| 04 May 2025 | Medium | PX_FCV-1719A | FCV-1719A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Jul 2025 | 20 | 203000033054 | Turnaround |