GASKET,RING,8IN,150#,GR/304
Material 4100015095 · GASKET · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100015095
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 9 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 40 d · P80 51 d
- Unit price
- Rp 618,213
Recommendation
- 1.Forecast 7.7 EA/year: 7.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~40 days; expected demand during lead time 0.9.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 19.
- 4.On hand 1 + on order 2 is at or below the reorder point: order 16 now.
- 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 9.9M · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single sourceOpen PO
On hand / on order
1 / 2
next delivery 02 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
19
order qty 8
Service level
100.0%
stockout risk now 22%
Unit price
Rp 618,213
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 99 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 709.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 9 functional locations
6 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| UT_PP-641A PROPYLENE PUMP | A | 1 | 3 | 1.05 |
| PX_CL-1039 CHARGE GAS STRIPPER | A | 1 | 2 | 0.81 |
| PX_HE-1025 BFW PREHEATER | A | 1 | 1 | 0.22 |
| PX_HE-574B INHIBITOR TLE | A | 1 | 0 | 0.22 |
| PX_BF-103-DUCT22 PEEP DOOR | B | 1 | 3 | 1.30 |
| PX_HE-694C LEAN AMINE CONDENSER | B | 1 | 2 | 0.65 |
| PX_PP-942D RECYCLE ETHANE PUMP | C | 1 | 2 | 0.62 |
| PX_1-FG-23689-A11A-H PIPE-1 FROM VD-999 TO CL-672 | C | 1 | 0 | 0.01 |
| PX_PP-820A METHANE PUMP | S | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 40 ± 16 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Aug 2026 | PR03 Regular replenishment | 2 | Rp 613,695 | 02 Oct 2026 open | 50 d |
| 22 Jun 2025 | PR03 Regular replenishment | 2 | Rp 622,730 | 20 Aug 2025 | 59 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Sept 2026 | Medium | UT_PP-641A | Replace lamp as per PM finding |
| 03 Sept 2026 | Low | PX_PP-820A | [MSI-B-26-WPE-117] Permanent repair |
| 29 Jul 2026 | Medium | PX_BF-103-DUCT22 | Painting BF-103-DUCT22 |
| 15 Jul 2026 | Medium | UT_PP-641A | Replace lamp as per PM finding |
| 19 Jun 2026 | Medium | PX_HE-694C | Leak from packing |
| 01 Jun 2026 | Medium | PX_PP-942D | PP-942D high vibration |
| 12 May 2026 | Medium | PX_CL-1039 | CL-1039 DP high |
| 10 Sept 2025 | Medium | PX_BF-103-DUCT22 | Cleaning burner BF-103-DUCT22 |
| 09 Aug 2025 | Medium | PX_PP-942D | Install scaffolding at PP-942D |
| 23 Jun 2025 | Low | PX_BF-103-DUCT22 | Replace burner tip BF-103-DUCT22 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Jun 2026 | 2 | 201000013317 | Corrective |
| 14 May 2026 | 5 | 201000025335 | Corrective |