GASKET,RING,1/4IN,600#,GR/304

Material 4100015125 · GASKET · Plant 1000

AReorderNormalCritical insurance spare
Material
4100015125
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 2.9 EA/year: 2.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 9 now.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 5%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 9 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 211.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_3/4-BF-12683-A21A
PIPE-3/4 FROM PP-301C TO HE-1205D
C100.01
PX_FCV-772A
FLUSHING OIL FLOW CONTROL
C100.11
PX_PP-1744
PROPYLENE PUMP
C100.19
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_VD-1305A
FUEL OIL DRUM
S120.51

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-1744Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
21 Jul 2026MediumPX_BF-107Replace lamp as per PM finding
21 Jul 2026MediumPX_BF-107Thermograph wall BF-107
18 Jul 2026EmergencyPX_BF-107Hot spot at convection BF-107
10 Jul 2026MediumPX_BF-107Hot spot at convection BF-107
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.