GASKET,RING,3IN,600#,PTFE

Material 4100015184 · GASKET · Plant 1000

ASafety-criticalMonitorCritical insurance spare
Material
4100015184
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.3 EA/year: 0.6 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 3.Lead time ~31 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Safety-critical (SCE)Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 61.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_HE-1455C
COOLING WATER COOLER
A110.22
PX_HE-1481
CAUSTIC COOLER
A100.22
PX_CL-721
QUENCH OIL SCRUBBER
B162.09
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_SDV-289A
BOTTOM ISOLATION
S100.06

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jul 2026HighPX_CL-721CL-721 DP high
07 Feb 2026MediumPX_CL-721Install scaffolding at CL-721
15 Jan 2026LowPX_CL-721CL-721 DP high
28 Nov 2025HighPX_CL-721Inspect CL-721 internal
11 Nov 2025MediumPX_KC-235DLeak from packing
21 Oct 2025MediumPX_CL-721Leak from packing
17 May 2025MediumPX_CL-721Replace lamp as per PM finding
16 May 2025LowPX_KC-235DLeak from packing
04 May 2025MediumPX_HE-1455CPSM25/Cleaning HE-1455C

Recent goods issues

Never issued in the 17-month history.