GASKET,SHEET,1/2IN,600#,GR/304
Material 4100015255 · GASKET · Plant 1000
BReduceNon-moving
- Material
- 4100015255
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Stock 16 exceeds the level to keep (4) by 12.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.6%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_6-P-9517-B23A-HS PIPE-6 FROM HE-1305B TO PP-1747 | B | 1 | 0 | 0.01 |
| PX_PP-1470A METHANE PUMP | C | 1 | 3 | 1.05 |
| PY_PCV-649 BY PASS DUCT | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Low | PX_PP-1470A | Replace lamp as per PM finding |
| 04 Mar 2026 | Medium | PX_PP-1470A | Oil leak at PP-1470A bearing housing |
| 17 May 2025 | Medium | PX_PP-1470A | Install cover plate for MCP cracking |
Recent goods issues
Never issued in the 17-month history.