GASKET,RING,4IN,600#,GR/304
Material 4100015273 · GASKET · Plant 1000
AReduceNon-moving
- Material
- 4100015273
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 2.8 EA/year: 2.8 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 4.Stock 17 exceeds the level to keep (11) by 6.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
17 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 278.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-279C C3 RECYCLE COMPRESSOR | A | 1 | 3 | 1.43 |
| PY_PP-490 COOLING WATER PUMP | S | 1 | 6 | 2.33 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 05 Sept 2026 | Medium | PX_KC-279C | Overhaul |
| 26 Aug 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_BF-103 | Hot spot at convection BF-103 |
| 08 Aug 2026 | Medium | PY_PP-490 | PP-490 high vibration |
| 03 Aug 2026 | Medium | PX_BF-103 | Install scaffolding at BF-103 |
Recent goods issues
Never issued in the 17-month history.