GASKET,SW,3/4IN,300#,PTFE
Material 4100015404 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100015404
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 8 FuncLocs A/B)
- Supplier
- BINTANG MESINDO PRATAMA PT
- Lead time
- 29 d · P80 29 d
- Unit price
- Rp 214,997
Recommendation
- 1.Forecast 22 EA/year: 21 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 1.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 44.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 40 now.
- 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 53% probability of demand in the next 90 days.
Proposed purchase requisition
40 EA
Rp 8.6M · order by 01 Oct 2026
Expected arrival ≈ 29 days
ML early warningSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 20
Rec. Max
44
order qty 23
Service level
100.0%
stockout risk now 22%
Unit price
Rp 214,997
PO history
ML early warning: 53% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 358 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 977.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 8 functional locations
6 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_PCV-1887C BY PASS DUCT | A | 1 | 2 | 0.94 |
| PX_PP-339A METHANE PUMP | B | 1 | 6 | 2.33 |
| PX_PP-1253B LUBE OIL PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1426A CONDENSATE PUMP | B | 1 | 1 | 0.19 |
| PX_BF-103-BRN17 BURNER BF-103 | C | 1 | 0 | 0.45 |
| PY_ROF-1925B MP STEAM TO PP-866A | C | 1 | 0 | 0.00 |
Lead time and procurement
Lead time 29 ± 9 days (PO history, 3 PO lines) · on-time 49%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Jul 2026 | PR03 Regular replenishment | 1 | Rp 225,302 | 14 Aug 2026 | 30 d |
| 02 Mar 2026 | PR06 Regular replenishment | 1 | Rp 214,997 | 28 Mar 2026 | 26 d |
| 23 Nov 2025 | PR06 Regular replenishment | 2 | Rp 208,128 | 20 Dec 2025 | 27 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Mar 2027 | PX_PP-339A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 19 Jul 2026 | Low | PX_PP-339A | PP-339A seal leak |
| 25 Jun 2026 | Medium | PX_PCV-1887C | Install cover plate for MCP cracking |
| 27 May 2026 | Medium | PX_PP-339A | PP-339A seal leak |
| 04 Apr 2026 | Medium | PX_PP-339A | PP-339A seal leak |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 25 Mar 2026 | Medium | PX_PP-1253B | PP-1253B seal leak |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 26 Nov 2025 | Low | PX_PP-339A | PP-339A high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Oct 2025 | 7 | 201000005238 | Corrective |