GASKET,SW,3/4IN,300#,PTFE

Material 4100015404 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100015404
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
29 d · P80 29 d
Unit price
Rp 214,997

Recommendation

  • 1.Forecast 22 EA/year: 21 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 1.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 44.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 40 now.
  • 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 53% probability of demand in the next 90 days.
Proposed purchase requisition
40 EA
Rp 8.6M · order by 01 Oct 2026
Expected arrival ≈ 29 days
ML early warningSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 20
Rec. Max
44
order qty 23
Service level
100.0%
stockout risk now 22%
Unit price
Rp 214,997
PO history
ML early warning: 53% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 358 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 977.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 8 functional locations

6 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PCV-1887C
BY PASS DUCT
A120.94
PX_PP-339A
METHANE PUMP
B162.33
PX_PP-1253B
LUBE OIL PUMP
B120.62
PX_PP-1426A
CONDENSATE PUMP
B110.19
PX_BF-103-BRN17
BURNER BF-103
C100.45
PY_ROF-1925B
MP STEAM TO PP-866A
C100.00

Lead time and procurement

Lead time 29 ± 9 days (PO history, 3 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
15 Jul 2026PR03
Regular replenishment
1Rp 225,30214 Aug 202630 d
02 Mar 2026PR06
Regular replenishment
1Rp 214,99728 Mar 202626 d
23 Nov 2025PR06
Regular replenishment
2Rp 208,12820 Dec 202527 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-339APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
19 Jul 2026LowPX_PP-339APP-339A seal leak
25 Jun 2026MediumPX_PCV-1887CInstall cover plate for MCP cracking
27 May 2026MediumPX_PP-339APP-339A seal leak
04 Apr 2026MediumPX_PP-339APP-339A seal leak
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
25 Mar 2026MediumPX_PP-1253BPP-1253B seal leak
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
26 Nov 2025LowPX_PP-339APP-339A high vibration

Recent goods issues

Posting dateQtyOrderOrder type
08 Oct 20257201000005238Corrective