GASKET,SHEET,6IN,150#,PTFE

Material 4100015432 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100015432
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 1.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 27.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 23 now.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 4.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Last turnaround used 12Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 13
Rec. Max
27
order qty 13
Service level
99.9%
stockout risk now 15%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 321 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Lumpy · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 594.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-274C
QUENCH OIL REBOILER
A110.22
PX_VD-1069
PROPYLENE DRUM
B151.79
PX_MOV-1164B
MOTOR OPERATED GATE VALVE
C131.34
PX_8-QO-9275-A22A-H
PIPE-8 FROM HE-1025 TO HE-1968B
C100.01
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KC-856A
DEMIN WATER COMPRESSOR
S121.00

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
01 Aug 2026MediumPX_VD-1069VD-1069 level glass broken
14 Jul 2026LowPX_KC-856AInstall scaffolding at KC-856A
19 Apr 2026MediumPX_VD-1069Replace lamp as per PM finding
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
15 Dec 2025MediumPX_VD-1069Inspect VD-1069
25 Nov 2025LowPX_MOV-1164BReplace lamp as per PM finding
23 Nov 2025MediumPX_MOV-1164BMOV-1164B fail to open
05 Oct 2025LowPX_VD-1069VD-1069 level glass broken
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
14 Nov 202517204000003360Preventive
12 Nov 20254203000030064Turnaround
11 Nov 20252203000030064Turnaround
11 Nov 20256203000030064Turnaround
03 Aug 20252201000001647Corrective
19 May 20252204000017830Preventive