GASKET,SHEET,6IN,150#,PTFE
Material 4100015432 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100015432
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 1.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 27.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 23 now.
- 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 4.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Last turnaround used 12Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 13
Rec. Max
27
order qty 13
Service level
99.9%
stockout risk now 15%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 321 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (12 units) excluded from the baseline.
Demand pattern Lumpy · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 594.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 6 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-274C QUENCH OIL REBOILER | A | 1 | 1 | 0.22 |
| PX_VD-1069 PROPYLENE DRUM | B | 1 | 5 | 1.79 |
| PX_MOV-1164B MOTOR OPERATED GATE VALVE | C | 1 | 3 | 1.34 |
| PX_8-QO-9275-A22A-H PIPE-8 FROM HE-1025 TO HE-1968B | C | 1 | 0 | 0.01 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KC-856A DEMIN WATER COMPRESSOR | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 01 Aug 2026 | Medium | PX_VD-1069 | VD-1069 level glass broken |
| 14 Jul 2026 | Low | PX_KC-856A | Install scaffolding at KC-856A |
| 19 Apr 2026 | Medium | PX_VD-1069 | Replace lamp as per PM finding |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 15 Dec 2025 | Medium | PX_VD-1069 | Inspect VD-1069 |
| 25 Nov 2025 | Low | PX_MOV-1164B | Replace lamp as per PM finding |
| 23 Nov 2025 | Medium | PX_MOV-1164B | MOV-1164B fail to open |
| 05 Oct 2025 | Low | PX_VD-1069 | VD-1069 level glass broken |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Nov 2025 | 17 | 204000003360 | Preventive |
| 12 Nov 2025 | 4 | 203000030064 | Turnaround |
| 11 Nov 2025 | 2 | 203000030064 | Turnaround |
| 11 Nov 2025 | 6 | 203000030064 | Turnaround |
| 03 Aug 2025 | 2 | 201000001647 | Corrective |
| 19 May 2025 | 2 | 204000017830 | Preventive |