GASKET,SHEET,1-1/2IN,600#,GR/304

Material 4100015496 · GASKET · Plant 1000

BReduceSlow-moving
Material
4100015496
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 3.2 EA/year: 3.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Stock 11 exceeds the level to keep (8) by 3.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 415 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 128.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-169A
QUENCH OIL PUMP
B151.90
PX_HE-1522
RECYCLE ETHANE REBOILER
C100.22
PX_BF-101
CRACKING FURNACE BF-101
S183.02

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jul 2026MediumPX_PP-169AInstall cover plate for MCP cracking
25 Jun 2026MediumPX_PP-169APP-169A seal leak
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
05 Apr 2026MediumPX_PP-169AOverhaul PP-169A
20 Dec 2025MediumPX_PP-169AOverhaul PP-169A
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 20252201000013949Corrective