GASKET,SHEET,2IN,150#,GR/304

Material 4100015525 · GASKET · Plant 1000

SSafety-criticalMonitorSlow-moving
Material
4100015525
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
DUTA UTAMA PERSADA PT
Lead time
31 d · P80 51 d
Unit price
Rp 168,412

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
Safety-critical (SCE)Single source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 168,412
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 244 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 237.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-200A
CL-1578 SHUTDOWN VALVE
S120.48

Lead time and procurement

Lead time 31 ± 16 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
20 Aug 2026PR03
Regular replenishment
2Rp 166,63608 Sept 202619 d
12 Nov 2025PR05
Project / turnaround
1Rp 170,18827 Dec 202545 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Aug 2025MediumPX_SDV-200APainting SDV-200A
04 Jul 2025MediumPX_SDV-200ASDV-200A solenoid burnt

Recent goods issues

Posting dateQtyOrderOrder type
30 Jan 20263201000004425Corrective
29 Jan 20261201000004425Corrective