GASKET,SHEET,2IN,150#,GR/304
Material 4100015525 · GASKET · Plant 1000
SSafety-criticalMonitorSlow-moving
- Material
- 4100015525
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- DUTA UTAMA PERSADA PT
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 168,412
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
Safety-critical (SCE)Single source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 168,412
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 244 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 237.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-200A CL-1578 SHUTDOWN VALVE | S | 1 | 2 | 0.48 |
Lead time and procurement
Lead time 31 ± 16 days (PO history + category, 2 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Aug 2026 | PR03 Regular replenishment | 2 | Rp 166,636 | 08 Sept 2026 | 19 d |
| 12 Nov 2025 | PR05 Project / turnaround | 1 | Rp 170,188 | 27 Dec 2025 | 45 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Aug 2025 | Medium | PX_SDV-200A | Painting SDV-200A |
| 04 Jul 2025 | Medium | PX_SDV-200A | SDV-200A solenoid burnt |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Jan 2026 | 3 | 201000004425 | Corrective |
| 29 Jan 2026 | 1 | 201000004425 | Corrective |