GASKET,SHEET,8IN,600#,GR/304
Material 4100015549 · GASKET · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100015549
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 11.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
11
order qty 5
Service level
100.0%
stockout risk now 12%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 97 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 478.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 6 functional locations
3 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-532A QUENCH WATER COOLER | A | 1 | 0 | 0.22 |
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 1 | 5 | 2.28 |
| PX_PP-1158B FUEL OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-1470A METHANE PUMP | C | 1 | 3 | 1.05 |
| PX_PCV-1827B VD-103 PRESSURE CONTROL | C | 1 | 0 | 0.08 |
| PX_VD-1286B DILUTION STEAM SURGE DRUM | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Low | PX_PP-1470A | Replace lamp as per PM finding |
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 04 Mar 2026 | Medium | PX_PP-1470A | Oil leak at PP-1470A bearing housing |
| 19 Feb 2026 | Medium | PX_KC-624A | Overhaul |
| 25 May 2025 | Low | PX_KC-624A | Repair insulation KC-624A |
| 17 May 2025 | Medium | PX_PP-1470A | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jun 2026 | 3 | 201000033706 | Corrective |