Sparely
DU

GASKET,RING,10IN,600#,PTFE

Material 4100015570 · GASKET · Plant 1000

BReorderNormalBelow reorder point
Material
4100015570
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 24 EA/year: 24 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 2.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 42.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 37 now.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
37 EA
Rp 7.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 15
Rec. Max
42
order qty 25
Service level
99.9%
stockout risk now 31%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 356.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 6 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1756B
SLOP OIL CONDENSER
B1134.50
PX_VD-679
QUENCH WATER KO DRUM
B200.08
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KC-422A
C4 PRODUCT BLOWER
S162.71
PX_CL-1510
CONDENSATE STRIPPER
S121.23
PX_CL-899
SLOP OIL COLUMN
S100.38

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_HE-1756BHE-1756B tube leak
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
06 Aug 2026MediumPX_CL-1510Replace lamp as per PM finding
14 Jul 2026MediumPX_HE-1756BRetubing HE-1756B
10 Jul 2026LowPX_HE-1756BHE-1756B tube leak
08 Jul 2026MediumPX_KC-422AKC-422A high vibration
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
13 May 2026LowPX_KT-447KT-447 trip test
09 May 2026MediumPX_HE-1756BRetubing HE-1756B
01 May 2026LowPX_HE-1756B[MSI-B-26-TTX-189/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000018328Corrective
25 Jan 202610201000033106Corrective