GASKET,SHEET,8IN,300#,GRAPHITE

Material 4100015613 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100015613
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 2.0 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 857,815 · order by 01 Oct 2026
Expected arrival ≈ 31 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 417.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

2 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_MOV-731A
MOTOR OPERATED GATE VALVE
B100.06
PX_HE-1396C
PROPYLENE TLE
C472.79
PX_HE-593C
REFLUX REBOILER
C410.22
PY_HE-235A
DEMIN WATER CONDENSER
C110.22

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_HE-1396C[MSI-B-26-NWH-385] Permanent repair
15 Jun 2026MediumPX_HE-1396C[MSI-B-26-DDD-161] Permanent repair
22 Apr 2026LowPX_HE-1396CRetubing HE-1396C
03 Apr 2026HighPX_HE-1396CCleaning HE-1396C
10 Feb 2026MediumPX_HE-1396CHE-1396C fouling
11 Nov 2025MediumPX_KC-235DLeak from packing
07 Nov 2025MediumPX_HE-1396CLeak from packing
13 Aug 2025MediumPX_HE-593CInstall scaffolding at HE-593C
28 May 2025MediumPY_HE-235APSM25/HE-235A tube leak
16 May 2025LowPX_KC-235DLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
06 May 20251201000012283Corrective