GASKET,SW,8IN,600#,PTFE
Material 4100015663 · GASKET · Plant 1000
CSafety-criticalReorderNormalSlow-moving
- Material
- 4100015663
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- PRIMA LOGAM NUSANTARA PT
- Lead time
- 32 d · P80 51 d
- Unit price
- Rp 70,456
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 5.1 EA/year: 5.1 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~32 days; expected demand during lead time 0.4.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 16.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 14 now.
Proposed purchase requisition
14 EA
Rp 986,384 · order by 01 Oct 2026
Expected arrival ≈ 32 days
Safety-critical (SCE)Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
16
order qty 6
Service level
100.0%
stockout risk now 8%
Unit price
Rp 70,456
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 325.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 3 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-195A SAFETY VALVE PP-467A | C | 1 | 0 | 0.04 |
| PX_SDV-600 ON-OFF VALVE | C | 1 | 0 | 0.06 |
| PX_KT-202 TURBINE FOR KC-202 | S | 2 | 4 | 2.81 |
Lead time and procurement
Lead time 32 ± 16 days (PO history + category, 2 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Apr 2026 | PR03 Regular replenishment | 1 | Rp 68,861 | 03 Jun 2026 | 41 d |
| 22 Dec 2025 | PR03 Regular replenishment | 2 | Rp 72,051 | 15 Jan 2026 | 24 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Dec 2025 | 5 | 201000027946 | Corrective |