GASKET,SW,8IN,600#,PTFE

Material 4100015663 · GASKET · Plant 1000

CSafety-criticalReorderNormalSlow-moving
Material
4100015663
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
PRIMA LOGAM NUSANTARA PT
Lead time
32 d · P80 51 d
Unit price
Rp 70,456

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.1 EA/year: 5.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~32 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 16.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 14 now.
Proposed purchase requisition
14 EA
Rp 986,384 · order by 01 Oct 2026
Expected arrival ≈ 32 days
Safety-critical (SCE)Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
16
order qty 6
Service level
100.0%
stockout risk now 8%
Unit price
Rp 70,456
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 325.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-195A
SAFETY VALVE PP-467A
C100.04
PX_SDV-600
ON-OFF VALVE
C100.06
PX_KT-202
TURBINE FOR KC-202
S242.81

Lead time and procurement

Lead time 32 ± 16 days (PO history + category, 2 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
23 Apr 2026PR03
Regular replenishment
1Rp 68,86103 Jun 202641 d
22 Dec 2025PR03
Regular replenishment
2Rp 72,05115 Jan 202624 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
18 Dec 20255201000027946Corrective