GASKET,RING,1-1/2IN,600#,GR/304
Material 4100015694 · GASKET · Plant 1000
ASafety-criticalMaintainCritical insurance spare
- Material
- 4100015694
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~31 days; expected demand during lead time 0.0.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.8%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102-PD05 PEEP DOOR | A | 1 | 0 | 0.45 |
| PX_TCV-820 VD-103 TEMP CONTROL | A | 1 | 0 | 0.12 |
| PX_VD-1523 FUEL OIL KO DRUM | B | 1 | 0 | 0.08 |
| PX_3/4-CW-22289-A21A PIPE-3/4 FROM PP-785A TO CL-457 | C | 1 | 0 | 0.01 |
| PX_SDV-1095 DILUTION STEAM ISOLATION | S | 1 | 1 | 0.06 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 May 2025 | Medium | PX_SDV-1095 | Check SDV-1095.ok |
Recent goods issues
Never issued in the 17-month history.