GASKET,SW,4IN,600#,GR/304
Material 4100015715 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100015715
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 1.3M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 6%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 496 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 242.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
4 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_SDV-1353A FEED ISOLATION | A | 1 | 1 | 0.06 |
| PX_HE-1524B SLOP OIL CONDENSER | A | 1 | 0 | 0.22 |
| PX_HE-301B FUEL OIL REBOILER | A | 4 | 0 | 0.22 |
| PX_4-LS-8625-B22A-T PIPE-4 FROM HE-1555A TO CL-457 | C | 1 | 2 | 0.44 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Dec 2025 | Medium | PX_4-LS-8625-B22A-T | Leak at 4-LS-8625-B22A-T |
| 02 Oct 2025 | Medium | PX_KC-464A | KC-464A lube oil filter DP high |
| 25 Jul 2025 | Medium | PX_KC-464A | KC-464A lube oil filter DP high |
| 17 Jul 2025 | Medium | PX_SDV-1353A | Install scaffolding at SDV-1353A |
| 04 May 2025 | Low | PX_4-LS-8625-B22A-T | PSM25/Leak at 4-LS-8625-B22A-T |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 May 2025 | 2 | 204000016880 | Preventive |