GASKET,SHEET,10IN,600#,GRAPHITE
Material 4100015753 · GASKET · Plant 1000
AReorderCriticalStockout
- Material
- 4100015753
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 41 d · P80 51 d
- Unit price
- Rp 1.4M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~41 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 2.8M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 5%
Unit price
Rp 1.4M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 448 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 159.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1420C KC-957B PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_HE-1201C REFLUX REBOILER | B | 1 | 1 | 0.22 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 41 ± 16 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Aug 2025 | PR03 Regular replenishment | 2 | Rp 1.4M | 06 Nov 2025 | 71 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 May 2025 | Medium | PX_HE-1201C | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jul 2025 | 1 | 201000006998 | Corrective |