GASKET,SW,6IN,150#,GRAPHITE

Material 4100015769 · GASKET · Plant 1000

BReorderCriticalStockout
Material
4100015769
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.7 EA/year: 0.0 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 857,815 · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 619,898/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-817
PRESSURE CONTROL VALVE
B100.08
PX_FCV-1932
BY PASS LINE
C100.11

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Feb 2027PX_FCV-1932Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.