GASKET,SHEET,3IN,600#,GRAPHITE
Material 4100015806 · GASKET · Plant 1000
ASafety-criticalReorderCriticalBelow reorder point
- Material
- 4100015806
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 5 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 40 d · P80 51 d
- Unit price
- Rp 335,297
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 12 EA/year: 12 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~40 days; expected demand during lead time 1.3.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 26.
- 5.On hand 1 + on order 0 is at or below the reorder point: order 25 now.
- 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
25 EA
Rp 8.4M · order by 01 Oct 2026
Expected arrival ≈ 40 days
Safety-critical (SCE)Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 13
Rec. Max
26
order qty 12
Service level
99.9%
stockout risk now 17%
Unit price
Rp 335,297
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 36 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 535.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-888D FEED PREHEATER | A | 1 | 0 | 0.22 |
| PX_SDV-1829 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_PP-1540 FUEL OIL PUMP | B | 1 | 1 | 0.19 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_PRV-761 SAFETY VALVE PP-1011D | S | 1 | 2 | 0.90 |
Lead time and procurement
Lead time 40 ± 16 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Nov 2025 | PR06 Regular replenishment | 1 | Rp 329,121 | 13 Jan 2026 | 44 d |
| 08 Jun 2025 | PR03 Regular replenishment | 3 | Rp 341,472 | 11 Aug 2025 | 64 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 18 Sept 2026 | Medium | PX_PRV-761 | Recertification PRV-761 |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
| 15 Jun 2025 | Medium | PX_PRV-761 | Replace lamp as per PM finding |
| 02 May 2025 | Medium | PX_PP-1540 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Aug 2026 | 7 | 201000039395 | Corrective |