Sparely
DU

GASKET,SHEET,3IN,600#,GRAPHITE

Material 4100015806 · GASKET · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100015806
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
40 d · P80 51 d
Unit price
Rp 335,297

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 12 EA/year: 12 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~40 days; expected demand during lead time 1.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 26.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 25 now.
  • 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
25 EA
Rp 8.4M · order by 01 Oct 2026
Expected arrival ≈ 40 days
Safety-critical (SCE)Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 13
Rec. Max
26
order qty 12
Service level
99.9%
stockout risk now 17%
Unit price
Rp 335,297
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 36 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 535.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-888D
FEED PREHEATER
A100.22
PX_SDV-1829
ON-OFF VALVE
A100.06
PX_PP-1540
FUEL OIL PUMP
B110.19
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_PRV-761
SAFETY VALVE PP-1011D
S120.90

Lead time and procurement

Lead time 40 ± 16 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
30 Nov 2025PR06
Regular replenishment
1Rp 329,12113 Jan 202644 d
08 Jun 2025PR03
Regular replenishment
3Rp 341,47211 Aug 202564 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
18 Sept 2026MediumPX_PRV-761Recertification PRV-761
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland
15 Jun 2025MediumPX_PRV-761Replace lamp as per PM finding
02 May 2025MediumPX_PP-1540Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
26 Aug 20267201000039395Corrective