GASKET,SW,3IN,150#,GRAPHITE

Material 4100015807 · GASKET · Plant 1000

AReduceNon-moving
Material
4100015807
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Stock 17 exceeds the level to keep (8) by 9.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
17 / 0
no open PO
Today Min / Max
10 / 24
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 35.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-459B
HYDROGEN FLOW CONTROL
A130.96
PX_HE-1747A
SEAL OIL COOLER
A100.22
PX_CL-348
SEAL OIL TOWER
B130.81
PX_HE-224C
GASOLINE REBOILER
B110.22
PX_PCV-1065
PRESSURE CONTROL VALVE
C100.08
PX_CL-1546
LUBE OIL COLUMN
S100.38

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_CL-348Leak from packing
04 Aug 2026LowPX_FCV-459BFCV-459B stuck
25 May 2026MediumPX_FCV-459BFCV-459B passing
15 Mar 2026LowPX_CL-348Install scaffolding at CL-348
23 May 2025MediumPX_FCV-459BOverhaul FCV-459B
22 May 2025MediumPX_CL-348PSM25/[MSI-B-25-GCX-389] Permanent repai
04 May 2025MediumPX_HE-224CPainting HE-224C

Recent goods issues

Never issued in the 17-month history.