Sparely
DU

GASKET,SW,1IN,300#,GR/304

Material 4100015849 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100015849
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 0.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
  • 7.ML early warning: 42% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 1.3M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 42% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 376 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 612.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 8 functional locations

6 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PRV-1909B
SAFETY VALVE PP-1157
A110.47
PX_CL-634
C3 RECYCLE STRIPPER
A100.38
PX_PP-169A
QUENCH OIL PUMP
B151.90
PX_HE-903B
FEED PREHEATER
B120.65
PX_PP-1029C
DILUTION STEAM PUMP
B100.19
PX_TCV-931A
TEMPERATURE CONTROL VALVE
C120.55
PX_TCV-725
TEMPERATURE CONTROL VALVE
C100.12

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Jul 2026MediumPX_PP-169AInstall cover plate for MCP cracking
25 Jun 2026MediumPX_PP-169APP-169A seal leak
02 Jun 2026LowPX_TCV-931AInstall cover plate for MCP cracking
05 Apr 2026MediumPX_PP-169AOverhaul PP-169A
20 Dec 2025MediumPX_PP-169AOverhaul PP-169A
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
11 Dec 2025LowPX_HE-903BRepair insulation HE-903B
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
15 Jun 2025MediumPX_PRV-1909BLeak from packing
11 May 2025LowPX_PP-169AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20252201000005318Corrective