GASKET,SW,1IN,300#,GR/304
Material 4100015849 · GASKET · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100015849
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 8 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.3.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 6 now.
- 6.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
- 7.ML early warning: 42% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 1.3M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 42% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 376 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 612.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 8 functional locations
6 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_PRV-1909B SAFETY VALVE PP-1157 | A | 1 | 1 | 0.47 |
| PX_CL-634 C3 RECYCLE STRIPPER | A | 1 | 0 | 0.38 |
| PX_PP-169A QUENCH OIL PUMP | B | 1 | 5 | 1.90 |
| PX_HE-903B FEED PREHEATER | B | 1 | 2 | 0.65 |
| PX_PP-1029C DILUTION STEAM PUMP | B | 1 | 0 | 0.19 |
| PX_TCV-931A TEMPERATURE CONTROL VALVE | C | 1 | 2 | 0.55 |
| PX_TCV-725 TEMPERATURE CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Jul 2026 | Medium | PX_PP-169A | Install cover plate for MCP cracking |
| 25 Jun 2026 | Medium | PX_PP-169A | PP-169A seal leak |
| 02 Jun 2026 | Low | PX_TCV-931A | Install cover plate for MCP cracking |
| 05 Apr 2026 | Medium | PX_PP-169A | Overhaul PP-169A |
| 20 Dec 2025 | Medium | PX_PP-169A | Overhaul PP-169A |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 11 Dec 2025 | Low | PX_HE-903B | Repair insulation HE-903B |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 15 Jun 2025 | Medium | PX_PRV-1909B | Leak from packing |
| 11 May 2025 | Low | PX_PP-169A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2025 | 2 | 201000005318 | Corrective |