GASKET,SHEET,1/2IN,600#,GRAPHITE
Material 4100015914 · GASKET · Plant 1000
- Material
- 4100015914
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 24.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
4 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_PP-442A CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PY_CL-454 C3 RECYCLE TOWER | A | 1 | 0 | 0.38 |
| PX_HE-1642D BOTTOM CONDENSER | B | 1 | 0 | 0.22 |
| PX_ROF-916 MP STEAM TO VD-708 | C | 1 | 0 | 0.00 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.