GASKET,RING,1/4IN,150#,GR/304
Material 4100015941 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100015941
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.4 EA/year: 6.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.5.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 17.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 17 now.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
17 EA
Rp 3.6M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
17
order qty 7
Service level
100.0%
stockout risk now 10%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 98 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 410.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-178A QUENCH OIL FAN | A | 1 | 0 | 0.57 |
| PX_PCV-1103 PRESSURE CONTROL VALVE | B | 1 | 3 | 0.51 |
| PX_PP-1939 BFW PUMP | B | 1 | 0 | 0.19 |
| PX_PRV-868 SAFETY VALVE VD-1167 | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Jun 2026 | Medium | PX_PCV-1103 | PCV-1103; IA leak from regulator |
| 29 Sept 2025 | Medium | PX_PCV-1103 | Install scaffolding at PCV-1103 |
| 09 May 2025 | Medium | PX_PCV-1103 | [MSI-B-25-XXZ-362/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jun 2026 | 4 | 201000038239 | Corrective |
| 24 Apr 2026 | 6 | 204000001034 | Preventive |