GASKET,RING,1-1/2IN,150#,GRAPHITE
Material 4100015946 · GASKET · Plant 1000
AReduceSlow-moving
- Material
- 4100015946
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- RAJAWALI SARANA SENTOSA PT
- Lead time
- 34 d · P80 51 d
- Unit price
- Rp 250,288
Recommendation
- 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~34 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Stock 12 exceeds the level to keep (6) by 6.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Single source
On hand / on order
12 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 250,288
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 293.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 3 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-902B BFW PUMP | A | 4 | 8 | 2.33 |
| PX_LCV-303 VD-1035D LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_VD-999 ETHYLENE ACCUMULATOR | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 34 ± 16 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2025 | PR06 Regular replenishment | 1 | Rp 250,288 | 31 Oct 2025 | 44 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Jul 2026 | Low | PX_PP-902B | Replace lamp as per PM finding |
| 02 Mar 2026 | Medium | PX_PP-902B | Install scaffolding at PP-902B |
| 26 Feb 2026 | Medium | PX_PP-902B | Install cover plate for MCP cracking |
| 26 Nov 2025 | High | PX_PP-902B | PP-902B abnormal noise |
| 15 Oct 2025 | Medium | PX_PP-902B | Install scaffolding at PP-902B |
| 22 Sept 2025 | High | PX_PP-902B | Repair insulation PP-902B |
| 04 Sept 2025 | Medium | PX_PP-902B | [MSI-B-25-WCE-184] Permanent repair |
| 04 May 2025 | Medium | PX_PP-902B | PP-902B seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Dec 2025 | 2 | 201000033177 | Corrective |