GASKET,RING,3IN,150#,GRAPHITE
Material 4100016022 · GASKET · Plant 1000
SReducePotentially obsolete
- Material
- 4100016022
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 17 exceeds the level to keep (0) by 17.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
17 / 0
no open PO
Today Min / Max
10 / 30
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 95,958/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~15 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1165 HYDROGEN TOWER | S | 3 | 5 | 1.23 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Jan 2026 | High | PX_CL-1165 | Install scaffolding at CL-1165 |
| 07 Dec 2025 | Medium | PX_CL-1165 | Replace lamp as per PM finding |
| 01 Dec 2025 | Medium | PX_CL-1165 | Install scaffolding at CL-1165 |
| 27 Sept 2025 | Medium | PX_CL-1165 | CL-1165 DP high |
| 03 Aug 2025 | Low | PX_CL-1165 | Install scaffolding at CL-1165 |
Recent goods issues
Never issued in the 17-month history.