Sparely
DU

GASKET,RING,3/4IN,600#,GRAPHITE

Material 4100016027 · GASKET · Plant 1000

AReduceNon-moving
Material
4100016027
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.Stock 287 exceeds the level to keep (4) by 283.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
287 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.3%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 25.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-894
COOLING WATER COLUMN
A110.38
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_BF-108-COIL32
CONVECTION SECTION
B100.45
PX_12-IA-26555-D12A-T
PIPE-12 FROM KC-730 TO HE-286C
C100.01
PX_KC-236B
DILUTION STEAM FAN
S110.57

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 May 2025MediumPX_CL-894Replace lamp as per PM finding
06 May 2025MediumPX_KC-236BPSM25/Install scaffolding at KC-236B

Recent goods issues

Never issued in the 17-month history.