GASKET,SW,1IN,600#,PTFE
Material 4100016049 · GASKET · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100016049
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 5.0 EA/year: 5.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 16.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 14 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
14 EA
Rp 3.0M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
16
order qty 6
Service level
100.0%
stockout risk now 8%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 17 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 324.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1686 ETHYLENE SCRUBBER | A | 1 | 3 | 0.81 |
| PX_FCV-837C HYDROGEN FLOW CONTROL | A | 1 | 0 | 0.11 |
| PX_PP-795D FEED PUMP | A | 1 | 0 | 0.19 |
| PX_HE-1061B SPENT CAUSTIC TLE | C | 2 | 3 | 0.65 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | Medium | PX_CL-1686 | Repair insulation CL-1686 |
| 03 Sept 2026 | Medium | PX_CL-1686 | Install scaffolding at CL-1686 |
| 23 May 2026 | Medium | PX_HE-1061B | Install scaffolding at HE-1061B |
| 22 Dec 2025 | Medium | PX_HE-1061B | Replace lamp as per PM finding |
| 25 May 2025 | Medium | PX_HE-1061B | Replace lamp as per PM finding |
| 12 May 2025 | Low | PX_CL-1686 | Inspect CL-1686 internal |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Sept 2026 | 5 | 201000010235 | Corrective |