Sparely
DU

GASKET,SW,3/4IN,150#,GRAPHITE

Material 4100016129 · GASKET · Plant 1000

ASafety-criticalReorderNormalCritical insurance spare
Material
4100016129
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.9 EA/year: 0.9 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~31 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.On hand 4 + on order 0 is at or below the reorder point: order 4 now.
  • 6.No issue in 17 months, but it protects critical equipment: keep it.
  • 7.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 857,815 · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 88.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_VD-1850
ETHYLENE KO DRUM
B200.08
PX_VD-679
QUENCH WATER KO DRUM
B100.08
PX_SDV-944
SLOP OIL ISOLATION
S120.91

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
20 Nov 2025MediumPX_KT-419ALeak from packing
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
10 Nov 2025MediumPX_KT-419APainting KT-419A
24 Sept 2025MediumPX_SDV-944SDV-944 solenoid burnt
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A

Recent goods issues

Never issued in the 17-month history.